HOME IMPROVEMENTS
The DRC consists of a five-member panel. All panel members are Ocean Pointe resident homeowners. The role of the Ocean Pointe Master Association is to assist the homeowner and present applications to the DRC for adjudication.
The DRC has jurisdiction over all construction, additions, alterations or repairs on any residential development in Ocean Pointe. The DRC responsibilities include:
- preserving the visual character of improvements within Ocean Pointe.
- regulating the exterior appearance of buildings, including landscaping, to maintain consistency with the intentions of the original designs of the developers.
- reviewing all applications for construction, additions, modifications, and site improvements visible from streets or neighboring properties.
Therefore, no improvements shall be placed, erected, constructed or installed (including, but not limited to, staking, clearing, excavation, grading and other site work, exterior alteration of existing improvements, and planting or removing of landscaping materials) upon any lot within Ocean Pointe except in compliance with the approval of the DRC; provided, however, that certain activities may not require the approval of the DRC when such activities are undertaken in strict compliance with the terms and conditions of the Design Guidelines.
Owners must submit the following fees with the completed Application and the required documentation set forth above:
- Preliminary Review: $25.00.
- Maintenance and Repair: $50.00; provided however, that no fee is required if the work replaces existing materials and colors with substantially identical materials and colors.
- Minor Projects (both Architectural and Landscaping): $50.00
- Major Projects: $100.00
No fees shall be charged for the installation of: (a) a photovoltaic device; (b) an antenna or transmission reception dish; or (c) an electric vehicle charging system.
If an Application is submitted after work has commenced, the Fee shall be two times the amount provided above.
Unfortunately, the Ocean Pointe Sub-Association does NOT have jurisdiction over any construction, additions, alterations or repairs on any residential development in Ocean Pointe. Nor do they have the authority to waive any additional Fees associated with a Design Application.
However, the current homeowner should be made aware that if an unapproved design item is found “after the fact”, the current homeowner will need to submit a design request for an approval.
THE HOME IMPROVEMENT PROCESS
1. READ THE DESIGN GUIDELINES
2. SUBMIT A DESIGN REVIEW APPLICATION
Submit your application, along with any other required documentation, to the Ocean Pointe Community Center Design Specialist. Please allow a sufficient time period for your application to be reviewed. Incomplete information only delays your project.
Design Review Applications should include:
- A signed and completed Design Review Application
- Applicable Application Fee (preliminary: $25, Maintenance & Repair: $50, Minor Architectural & Landscape: $50, Major: $100. No application fee for Solar installations, Satellite Dishes or Mailboxes. No fee for applications that are replacing with same material and color.)
- One (1) copy of your DPP plot plan
- One (1) diagram depicting your proposed plans (we recommend the ProCreate app if doing a landscape design)
- Color photos of specific area(s) of property of the proposed plan
- Manufacturer Specifications (if applicable)
3. THE DESIGN REVIEW COMMITTEE
Design Review Committee Guidelines:
- Applications must be received by the Ocean Pointe design specialist no later than 3:00 PM Wednesday afternoon, the week before the scheduled Friday meeting.
- DRC's approval of an application reflects its view for compliance within each subdivision's DG in terms of appearance.
- All decisions and discussions by the DRC regarding applications are made behind closed doors.
- Prior actions or an approval by the DRC does not guarantee approvals or consideration for any other later application.
- If a quorum is not met for the DRC meeting, it will be rescheduled to the next scheduled Friday.
4. APPROVAL OR REJECTION
You will be notified of the approval or denial of your request in writing by our office. Initial notices are sent via email to the email address provided on your design application. Formal approval letters will be mailed to the address on the application. Receipt of a formal approval letter is an authorization to start work. If you have questions, please contact the Ocean Pointe Design Specialist at 808-689-7500.
5. CHECK YOUR APPLICATION STATUS
Pre-Approved Items
Design Review Application Must Be Submitted